5
EXTRUCTION OF PANELAS OF CROVERS: final work
Installation loops, and steel anchors of floor slabs are fastened with special welding, but only after their thorough check. And the joints that are formed along during installation between concrete ceilings should be filled with special solutions throughout the depths.
After the installation of reinforced concrete ceilings was made, the joints of the plates with the walls should be filled with cement-sand solution or traffic jams made of concrete. In this case, the depth in the plates should be about 10-12 cm, but not more than. This is necessary so that the walls in the cold days of the year do not freeze in places of wall supports on reinforced concrete slabs used as an overlap between floors.