Technology and stages of filling the strip foundation
Often during the construction of houses, the strip method of filling the foundation is used. This is the most convenient and one of the cheapest types of foundation. It is especially relevant if you are going to build a small structure (summer kitchen, garage, garden house, etc.).
Having made a strip foundation yourself, you will save up to 50% concrete mixture and considerable money necessary to pay for the services of specialists. For light buildings, the strip foundation should be deepened about 20-25 cm below the level of freezing of the soil. In this case, the total height of the foundation will be, on average, 70 cm. The basis for the new building should be as strong as possible, so use only high -quality cement to fill the strip foundation.
At the end of the filling after 3-4 hours, cover the foundation with some protective material (for example, burlap). 7-10 days will be enough to set concrete. After that, the construction can be continued. Full design power, the foundation will reach about 1 month. If you know the features of the soil well, you can calculate the most accurate laying depth. You will need accurate indicators if you are going to build a big house.