Self -erection of a fence: stages of work
The reinforcement is located along the pillar in the form of a frame, and we connect with each other transverse reinforcements or wire. Formwork is wooden or metal. The shape is round or square.
We make formwork from a metal pipe if we use round pillars. And their inner diameter will be equal to the diameter of the pillars. Pour pillars in place, since making a whole pillar is immediately problematic? We break the filling in several stages.
80% of the pipe is poured into the first stage, and after a few days it is weakened and the entire length of the pipe, moves, up and again pour concrete. A big plus to make concrete fence with our own hands is that we can fill the pillars on our own and slowly and maximize its strength. If there is no possibility of pouring pillars in place, then we use the method of filling in the formwork.