Self -erection of a fence: the last stages
The manufacture of columns is complete and now we will go directly to the fence. First you need to stretch the cord 0.5 meters in height, where the fence is installed. We make holes in a depth of 50 cm, repeating every 2 meters.
Using crushed stone or broken brick, we make a pillow under the poles. We put the rail into the column groove so that the rail corresponds to level indicators. So we check that the pillars would be at the same level. We proceed to fix the second pillar. We leave the slats in the same place.
Dilute the solution 4: 1. Stir it and pour it into the holes carefully so as not to move the pillars. We control the vertical of the installation of the columns again using the construction level, after the solution was filled, since the pillars could move during pouring. Within three days, let the solution dry out and we can start assembling the fence.