What stages must be performed for laying tiles in the bathroom

by matheking

Tile laying technology in the bathroom

Before working, the level must be checked by the evenness of the walls, where they should be strictly perpendicular to the floor and ceiling. To align the surface of the walls, you can use plaster or moisture -resistant drywall. Plasterboard is easier, and it is difficult to plaster. Before using materials for leveling the level, you need to set the beacons. After leveling the wall, you need to primed. If the laying of the tiles is carried out on a strong concrete base or adhesive mixture, then the primer is not required.

After drying the surface, you can proceed to laying the tiles. During operation, some tiles will need to be cut with a sharp spatula or knife, making efforts, and broken with pliers or hands. If there is appropriate equipment, then you can use it. Then the glue solution with a inanched spatula is applied to the lower surface of the tile and the wall surface. To obtain the same distances between the seams, you need to use remote crosses.

When laying each tile, it is necessary to check its evenness level, otherwise curvature may form. After laying tiles, the seams are cleaned of glue. Then a special mixture between the seams is extended. After laying and drying the tiles, the surface is treated with a soap solution.

You may also like

© Business World – matheking.com, 2017-2024.